電站廠房基坑邊坡加固處理技術(shù)探討
發(fā)布日期:2017-02-08 08:03:26 瀏覽量:1712
【摘要】水利工程施工過程中,邊坡的穩(wěn)定性是經(jīng)常出現(xiàn)的問題,一旦邊坡失去了穩(wěn)定性,不僅影響水利工程的正常施工,甚至?xí){到水利工程的正常運(yùn)行。為了保證工程建設(shè)順利進(jìn)行,應(yīng)盡可能地避免邊坡滑體的移動(dòng),采取一定的加固措施,進(jìn)一步提高巖體及邊坡的整體穩(wěn)定性。本文就黃龍灘水電站發(fā)電廠房基坑及邊坡的地質(zhì)條件,提出有針對(duì)性的邊坡加固處理技術(shù)措施,供各位同行參考。
(仙居縣水力發(fā)電公司浙江臺(tái)州317300)周建廣
關(guān)鍵詞 邊坡加固處理;系統(tǒng)巖質(zhì)錨桿;隨機(jī)錨桿;錨筋樁;坡頂減載處理
Treatment Technology Powerhouse Pit Slope Reinforcement
Zhou Jian-Guang
(Hydraulic power company of Xian Ju countyTaizhouZhejiang317300)
【Abstract】The marine hydraulic engineering starts construction process in, the stability of side ascent is usually to appear of problem, once the side ascent lost a stability and not only influenced the normal construction of marine hydraulic engineering, even will threaten the normal movement of marine hydraulic engineering.For promising that the engineering construction should avoid a side possibly smoothly progress the ascent slip the ambulation of body, adopt to definitely reinforce measure and raise the whole stability of rock body and side ascent further.this text Huang Long Tan water electricity the station generate electricity the geology condition of the factory premises radicle pit and side ascent and put forward to have the side ascent to aim at sex to reinforce processing technique measure and be provided for everyone to go together reference.
【Key words】The side ascent reinforces a processing;The system rock quality anchor man pole;Random anchor man pole;Anchor man Jin stake;The ascent crest reduces to carry a processing
1.1工程概況。
黃龍灘水電站位于湖北省十堰市黃龍鎮(zhèn)上游4.0Km的峽谷出口處、漢江支流堵河上游,距十堰市區(qū)約33.0Km,為堵河開發(fā)的一期工程。主體工程于1969年4月開工,1976年底竣工。擴(kuò)建工程于2002年6月底開工建設(shè),2005年6月首臺(tái)機(jī)組投產(chǎn)發(fā)電,2005年8月第二臺(tái)機(jī)組投產(chǎn)發(fā)電。黃龍灘水電站擴(kuò)建工程建筑物主要由進(jìn)水口、壓力引水隧洞、發(fā)電廠房及開關(guān)站、尾水渠及大峽溝整治等組成,本文主要就發(fā)電廠房廠房左右側(cè)邊坡加固處理技術(shù)措施展開討論。
1.2發(fā)電廠房左右側(cè)邊坡地質(zhì)條件。
擴(kuò)建工程區(qū)基坑開挖出露的地層為第四系殘破積層及古老的結(jié)晶片巖,結(jié)晶片巖分為正、副片巖兩大類,由于巖性變化大,巖體風(fēng)化差異顯著。正片巖為綠泥鈉長片巖,正片巖面狀風(fēng)化不顯著,以裂隙發(fā)育的囊狀風(fēng)化為主,呈穿插分布。副片巖主要為白云母石英鈉長片巖,副片巖面狀風(fēng)化明顯。片理產(chǎn)狀的趨勢(shì)走向北西西,側(cè)向北東,傾角大于60°,在高程159.0以下呈微風(fēng)化或新鮮狀態(tài),其上均呈弱風(fēng)化狀態(tài)。
1.3發(fā)電廠房邊坡現(xiàn)狀。
發(fā)電廠房基坑設(shè)計(jì)底▽139.85,上下游樁號(hào)范圍為廠上0+001.500~廠下0+024.53,上下游方向距離為23.03m,左右側(cè)樁號(hào)范圍為廠右0+010.00~廠左0+037.65,左右方向距離為47.65m。樁號(hào)廠上0+001.50~廠上0+012.65段為1:1的坡面,其高程由▽139.85升高至▽151.00,樁號(hào)廠上0+012.65~廠上0+018.00段為▽151.00平臺(tái)。樁號(hào)廠右0+010.00~廠右0+012.788段為1:0.25的坡面,廠右0+012.788~廠右0+014.288為▽151.00寬1.5m的馬道,廠右0+014.288~廠右0+018.538段為1:0.25的坡面,廠右0+018.538~廠右0+020.038為▽168.00寬1.5m的馬道。樁號(hào)廠左0+037.65~廠左0+040.438段為1:0.25的坡面,廠左0+040.438~廠左0+043.15為▽151.00的平臺(tái)。詳見“附圖1:廠房基坑開挖設(shè)計(jì)平面圖”。
(1)發(fā)電廠房左右側(cè)邊坡已按設(shè)計(jì)圖紙的要求開挖至▽151.00,且自▽178.00以下基坑開挖均為巖性基礎(chǔ),▽178.00~▽168.00開挖主要按1:0.75坡度進(jìn)行,▽168.00以下開挖主要按1:0.25坡度進(jìn)行,開挖坡度陡,再加上實(shí)際開挖揭露的巖性地質(zhì)條件與基礎(chǔ)勘探的地質(zhì)條件存在較大程度的差異,現(xiàn)狀巖石裂隙發(fā)育,受爆破震動(dòng)和雨水侵蝕的影響,,邊坡有失穩(wěn)、塌陷現(xiàn)象,需要采取措施進(jìn)行加固處理。
(2)承包商綜合考慮巖性走向和裂隙發(fā)育程度、地質(zhì)條件、開挖面設(shè)計(jì)坡度等有關(guān)情況,結(jié)合現(xiàn)場(chǎng)實(shí)際,制定措施如下:對(duì)廠右邊坡▽151.00~▽178.00(含▽168.00和▽178.00馬道)設(shè)置長度為3.0m的系統(tǒng)巖質(zhì)錨桿和隨機(jī)錨桿,系統(tǒng)錨桿間排距為3.0×3.0m,掛網(wǎng)噴C20混凝土,邊坡均設(shè)置深0.7m的PVC花管排水孔,排水孔間排距3.0×3.0m;廠左副廠房▽151.00~▽171.20右側(cè)邊坡設(shè)置長度為3.0m的隨機(jī)巖質(zhì)錨桿,噴C20混凝土,其中▽171.20~▽158.00掛8#鐵絲網(wǎng)。2003年2月10日廠左副廠房▽168.00平臺(tái)及▽168.00~▽151.00下游側(cè)邊坡發(fā)生大面積滑坡塌陷,為增加其穩(wěn)定性承包商在▽168.00平臺(tái)上設(shè)置6根×4.0/根的m25隨機(jī)錨桿,在▽168.00~▽151.00下游側(cè)邊坡設(shè)置4根×4.0m/根和6根×3.0m/根的25隨機(jī)錨桿;根據(jù)“(廠)字第09號(hào)”《設(shè)計(jì)更改通知單》的要求,對(duì)廠右▽151.00~▽168.00、廠下0+002.000~廠上0+023.000段坡面進(jìn)行加固處理:設(shè)置長度為6.0m的32砂漿錨桿,錨桿間排距3.0×3.0m。該部分工作已于2月底之前完成。
根據(jù) “(廠)字第10號(hào)設(shè)計(jì)更改通知單”的要求,須對(duì)廠左右邊坡進(jìn)行如下加固處理,邊坡加固處理的具體要求如下所示。
3.1廠右邊坡加固處理要求。
(1)在▽168.00馬道附近間隔布置4排15.0m深錨筋樁及8.0m深32砂漿錨桿,傾角35°,錨桿間距3.0m,排距3.0m,外露0.4m。
(2)在高程▽146.00~▽161.00間隔布置6排15.0m深錨筋樁及8.0深32砂漿錨桿,傾角25°,錨桿間距3.0m,排距3.0m,外露0.4m。
(3)▽146.00以下布置6.0m深28砂漿錨桿,間排距3.0×3.0m,,傾角25°,外露1.0m。
3.2廠左邊坡加固處理要求。
(1)在▽167.00按1.:0.75坡度開挖形成5.0m寬平臺(tái),并在其上布置4排8.0~12.0m深 砂漿錨桿,傾角35°,錨桿間排距3.0×3.0m,外露0.4m。
(2)在高程▽146.00~▽161.00間隔布置5排15.0m深錨筋樁及8.0深32砂漿錨桿,傾角25°,錨桿間距3.0m,排距3.0m,外露0.4m。
(3)▽146.00以下布置6.0m深32砂漿錨桿,間排距3.0×3.0m,傾角25°,外露1.0m。
3.3廠左和廠右▽146.00~▽161.00坡面現(xiàn)澆加固板施工要求。
(1)在高程▽146.00~▽161.00坡面現(xiàn)澆0.4m厚鋼筋混凝土加固板,外側(cè)配鋼筋網(wǎng)(水平主筋25@25cm,豎向分布筋22@25cm),鋼筋凈保護(hù)層厚5cm。
(2)15.0m深錨筋樁及8.0深32砂漿錨桿外露0.4m,并帶0.6m長彎鉤與加固板或錨固頭鋼筋焊接。
(3)錨筋樁鋼筋接長采用坡口對(duì)焊,鋼筋之間每隔3.0m采用10cm焊縫焊接,注漿管距孔底0.5m,沿程與鋼筋點(diǎn)焊連接。
3.4其它要求。
(1)錨桿采用螺紋鋼全長粘結(jié)型水泥砂漿錨桿。
(2)除現(xiàn)澆0.4m厚鋼筋混凝土加固板坡面外,其余坡面掛網(wǎng)噴8.0cm厚C20 混凝土,坡面設(shè)置深0.7m、間排距3.0×3.0m的PVC花管排水孔,梅花型布置。
4.1廠右頂部減載處理施工程序。
進(jìn)場(chǎng)施工路布置——漿砌石鉆爆——反鏟開挖 ——自卸車由新上壩路出渣
渣料二次倒運(yùn)入基坑——渣料運(yùn)至棄渣場(chǎng)。
4.2廠右邊坡加固處理施工程序。
腳手架搭設(shè)——錨桿及錨筋樁點(diǎn)位放樣施測(cè) ——錨桿及錨筯樁加工制作
錨桿及錨筯樁點(diǎn)位鉆孔——錨桿及錨筋樁注漿插桿——加固板鋼筋配筋制安——模板支立及架立筋架設(shè)——模板驗(yàn)收——加固板混凝土澆筑——混凝土養(yǎng)生。
4.3廠左邊坡加固處理施工程序。
廠左坡頂減載處理——渣料清除出渣——腳手架搭設(shè)——錨桿及錨筋樁點(diǎn)位放樣施測(cè)——錨桿及錨筯樁加工制作
錨桿及錨筯樁點(diǎn)位鉆孔——錨桿及錨筋樁注漿插桿——加固板鋼筋配筋制安——模板支立及架立筋架設(shè)——模板驗(yàn)收——加固板混凝土澆筑——混凝土養(yǎng)生
5.1概況。
按“(廠)字第06號(hào)設(shè)計(jì)更改通知單”的要求,承包商在廠右下游側(cè)坡(即廠右0+031.000部位)進(jìn)行二次開挖時(shí)已將坡頂?shù)谌罎{砌石擋墻與第四道漿砌石擋墻間的平臺(tái)面(高程約為▽186.0)作了有效的減載處理,但按“(廠)字第10號(hào)設(shè)計(jì)更改通知單”和“第14號(hào)《監(jiān)理協(xié)調(diào)會(huì)議紀(jì)要》”的要求需對(duì)廠右邊坡頂部作減載處理,因此本次減載的主要部位為第一、第二及第三道漿砌石擋墻(這三道漿砌石擋墻頂?shù)母叱谭謩e約為 ),工程量按實(shí)際發(fā)生量計(jì)。
5.2施工方法。
此三道漿砌石擋墻拆除采用小藥量鉆爆法并配合風(fēng)鎬撬挖人工拆除,拆除后的塊石等渣料拋至廠房基坑再由基坑內(nèi)施工出渣路棄至孫家溝棄渣場(chǎng)。
5.3施工安全。
(1)坡頂減載處理施工時(shí),為免使?jié)L落的石料砸傷基坑內(nèi)機(jī)械設(shè)備及人員,施工階段廠右基坑危險(xiǎn)區(qū)域內(nèi)暫停施工,嚴(yán)禁任何機(jī)械設(shè)備及人員在該區(qū)域內(nèi)逗留,并由專人擔(dān)任安全監(jiān)護(hù)。
(2)由于需要拆除的漿砌石擋墻臨空面面向老廠房已建開關(guān)站,其上又有高壓線路通過,為防止飛石對(duì)已建開關(guān)站及高壓線的影響,需采用小藥量拆除爆破法,孔口加強(qiáng)堵塞并覆以炮被等防護(hù)措施。
6.1腳手架(腳手平臺(tái))搭設(shè)。
腳手架采用50鋼管3排搭設(shè),腳手立柱間距6.0m,排距2.0m,層高2.5m,搭設(shè)時(shí)需將腳手鋼管與坡面上的錨筋牢固連接以確保腳手架的穩(wěn)定性,每層鋪以竹跳板作為施工平臺(tái),采用8#鐵絲將竹跳板與腳手鋼管牢固綁扎。搭設(shè)好的腳手架至少須能承受1500Kgf的動(dòng)荷載及1000Kgf的靜荷載。
6.2錨桿及錨筋樁加工制作。
(1)錨桿及錨筋樁在鋼筋加工場(chǎng)加工制作,鋼筋切割機(jī)切割機(jī)械拉伸,錨桿的接長采用搭接焊接,單面焊,焊縫長度為鋼筋直徑的2.5倍。
(2)錨筋樁采用3根32鋼筋與 1根25注漿鋼管組成,其結(jié)構(gòu)形式見圖紙。錨筋樁鋼筋接長采用坡口對(duì)焊,為避免在同一截面上的鋼筋出現(xiàn)應(yīng)力集中或脆斷現(xiàn)象,應(yīng)將焊縫相互錯(cuò)開,鋼筋之間每隔3m采用10cm焊縫焊接,25注漿鋼管底應(yīng)短于錨筋樁底部50cm,沿程與鋼筋點(diǎn)焊連接。為便于灌漿施工,在制作焊接注漿鋼管之前可在 注漿鋼管壁上以1.0m間距打鑿若干出漿小孔,出漿孔孔徑不得小于注漿砂漿最大顆粒粒徑;為使安裝好的錨桿(錨筋樁)剛好位于鉆孔中心并使其周圍砂漿分布均勻,應(yīng)根據(jù)鉆孔孔徑及錨桿(錨筋樁)桿徑,在錨桿(錨筋樁)上焊接若干6mm定位支架鋼片。
6.3鉆孔施工。
錨桿孔采用TMY41高風(fēng)壓潛孔鉆孔,而錨筋樁則采用地質(zhì)鉆造孔,鉆孔前由測(cè)量隊(duì)施測(cè)鉆孔點(diǎn)位并以明顯標(biāo)記加以標(biāo)識(shí),然后將鉆機(jī)置于以搭建好的腳手架上,調(diào)好鉆孔角度并將鉆機(jī)與教手鋼管牢固綁扎以防鉆孔偏離設(shè)計(jì)位置。
6.4錨桿及錨筋樁的安裝。
15.0m深錨筋樁及8.0m深32砂漿錨桿采用15T汽車吊吊裝人工輔助送入孔內(nèi),插桿力量完全依靠吊索的上下提升或吊桿左右旋轉(zhuǎn)提供;6.0m深28砂漿錨桿則由人工插桿,當(dāng)插桿有困難時(shí),可采用倒鏈或15t汽車吊配合施工插桿。
6.5灌漿。
(1)8.0m深32砂漿錨桿與6.0m深25砂漿錨桿采用先注漿后插桿,而15.0m深的錨筋樁則采用先插桿后注漿的施工方法。在安裝錨筋樁之前,用膠布將注漿鋼管管口及管壁上的出漿小孔堵住,灌漿時(shí)隨著高壓砂漿的注入,裹于管底的膠布首先脹裂,水泥砂漿注滿錨樁孔一段長度,隨著高壓沙竟的逐漸注入苦果于管壁上的膠布由管底沿著管頂脹裂一段注滿一段,往復(fù)循環(huán)直至完全注滿整個(gè)錨樁孔。
(2)錨桿(樁)孔成孔后應(yīng)采用高壓風(fēng)清孔,不得壓水清洗,清孔完畢后注漿。注漿采用強(qiáng)度不低于325MPa的普通硅酸鹽水泥,砂漿強(qiáng)度等級(jí)應(yīng)不低于M30,采用最大粒徑小于2.5mm的中細(xì)砂。砂漿應(yīng)采用機(jī)械拌和,嚴(yán)禁人工攪拌,隨拌隨用。錨筋樁注漿直接由 注漿鋼管注入,其它錨桿采用 PVC注漿管注入,注漿壓力為0.2~0.8MPa。
坡頂減載施工。
坡頂減載采用手風(fēng)鉆鉆孔淺孔松動(dòng)爆破與預(yù)裂爆破相結(jié)合的施工方法進(jìn)行處理,爆破參數(shù)見表1和表2。
鉆孔軸線與設(shè)計(jì)誤差不應(yīng)大雨50,積水及巖粉應(yīng)采用高壓風(fēng)吹干凈,遇有塌孔時(shí)應(yīng)掃孔在注漿;
錨桿孔孔位、孔徑、孔深及布置形式應(yīng)符合設(shè)計(jì)圖紙的要求,孔距誤差不得超過5.0cm;
錨桿桿體入孔前應(yīng)平直、除銹,不得有污跡。
在進(jìn)行水利工程邊坡加固工程時(shí),應(yīng)該綜合工程的實(shí)際情況,地質(zhì)特點(diǎn)、資金使用等要素,在保證邊坡加固工程質(zhì)量的基礎(chǔ)上,選擇最科學(xué)的和最經(jīng)濟(jì)的處理方案,同時(shí)還要考慮施工的安全因素是否能夠得到國家標(biāo)準(zhǔn)。應(yīng)該具體問題具體分析,根據(jù)水利工程邊坡的施工需要選擇最為合適的加固措施,這樣不僅能夠保證施工質(zhì)量,還能夠節(jié)省施工成本,是施工企業(yè)能夠獲得更多的經(jīng)濟(jì)效益,促進(jìn)我國經(jīng)濟(jì)社會(huì)的發(fā)展。
參考文獻(xiàn)
[1]中國葛洲壩集團(tuán)公司編,周厚貴主編,三峽工程施工技術(shù)二期工程卷(VolumeⅡ),中國水利水電出版設(shè).
[2]中國水利學(xué)會(huì)《葛洲壩工程叢書》編輯委員會(huì),陳笑霖主編,葛洲壩工程叢書之土石方工程施工,水利電力出版社,1995年8月.
[3]中國水利水電基礎(chǔ)工程局編,夏可風(fēng)主編,水利水電工程施工手冊(cè) 第1卷 地基與基礎(chǔ)處理,水利電力出版社,2002年12月第01卷.
[4]水利電力部水利水電建設(shè)總局編,康世榮 陳東山總編,水利水電工程施工組織設(shè)計(jì)手冊(cè) 第2卷 施工技術(shù),水利電力出版社,1990年2月.
[文章編號(hào)]1006-7619(2014)10-31-718
[作者簡介] 周建廣(1978.10-),籍貫:浙江臺(tái)州仙居縣人,學(xué)歷:本科,職稱:水利工程師,浙江省市政二級(jí)建造師,水利水電工程專業(yè),目前在仙居縣水力發(fā)電公司工作
文章來源: 永年加固公司 本文鏈接: http://www.miseto.com/a_20170208160806.html 任何關(guān)于加固工程的問題和建議,敬請(qǐng)咨詢:0591-87868646
(仙居縣水力發(fā)電公司浙江臺(tái)州317300)周建廣
關(guān)鍵詞 邊坡加固處理;系統(tǒng)巖質(zhì)錨桿;隨機(jī)錨桿;錨筋樁;坡頂減載處理
Treatment Technology Powerhouse Pit Slope Reinforcement
Zhou Jian-Guang
(Hydraulic power company of Xian Ju countyTaizhouZhejiang317300)
【Abstract】The marine hydraulic engineering starts construction process in, the stability of side ascent is usually to appear of problem, once the side ascent lost a stability and not only influenced the normal construction of marine hydraulic engineering, even will threaten the normal movement of marine hydraulic engineering.For promising that the engineering construction should avoid a side possibly smoothly progress the ascent slip the ambulation of body, adopt to definitely reinforce measure and raise the whole stability of rock body and side ascent further.this text Huang Long Tan water electricity the station generate electricity the geology condition of the factory premises radicle pit and side ascent and put forward to have the side ascent to aim at sex to reinforce processing technique measure and be provided for everyone to go together reference.
【Key words】The side ascent reinforces a processing;The system rock quality anchor man pole;Random anchor man pole;Anchor man Jin stake;The ascent crest reduces to carry a processing
1. 工程概況
1.1工程概況。
黃龍灘水電站位于湖北省十堰市黃龍鎮(zhèn)上游4.0Km的峽谷出口處、漢江支流堵河上游,距十堰市區(qū)約33.0Km,為堵河開發(fā)的一期工程。主體工程于1969年4月開工,1976年底竣工。擴(kuò)建工程于2002年6月底開工建設(shè),2005年6月首臺(tái)機(jī)組投產(chǎn)發(fā)電,2005年8月第二臺(tái)機(jī)組投產(chǎn)發(fā)電。黃龍灘水電站擴(kuò)建工程建筑物主要由進(jìn)水口、壓力引水隧洞、發(fā)電廠房及開關(guān)站、尾水渠及大峽溝整治等組成,本文主要就發(fā)電廠房廠房左右側(cè)邊坡加固處理技術(shù)措施展開討論。
1.2發(fā)電廠房左右側(cè)邊坡地質(zhì)條件。
擴(kuò)建工程區(qū)基坑開挖出露的地層為第四系殘破積層及古老的結(jié)晶片巖,結(jié)晶片巖分為正、副片巖兩大類,由于巖性變化大,巖體風(fēng)化差異顯著。正片巖為綠泥鈉長片巖,正片巖面狀風(fēng)化不顯著,以裂隙發(fā)育的囊狀風(fēng)化為主,呈穿插分布。副片巖主要為白云母石英鈉長片巖,副片巖面狀風(fēng)化明顯。片理產(chǎn)狀的趨勢(shì)走向北西西,側(cè)向北東,傾角大于60°,在高程159.0以下呈微風(fēng)化或新鮮狀態(tài),其上均呈弱風(fēng)化狀態(tài)。
1.3發(fā)電廠房邊坡現(xiàn)狀。
發(fā)電廠房基坑設(shè)計(jì)底▽139.85,上下游樁號(hào)范圍為廠上0+001.500~廠下0+024.53,上下游方向距離為23.03m,左右側(cè)樁號(hào)范圍為廠右0+010.00~廠左0+037.65,左右方向距離為47.65m。樁號(hào)廠上0+001.50~廠上0+012.65段為1:1的坡面,其高程由▽139.85升高至▽151.00,樁號(hào)廠上0+012.65~廠上0+018.00段為▽151.00平臺(tái)。樁號(hào)廠右0+010.00~廠右0+012.788段為1:0.25的坡面,廠右0+012.788~廠右0+014.288為▽151.00寬1.5m的馬道,廠右0+014.288~廠右0+018.538段為1:0.25的坡面,廠右0+018.538~廠右0+020.038為▽168.00寬1.5m的馬道。樁號(hào)廠左0+037.65~廠左0+040.438段為1:0.25的坡面,廠左0+040.438~廠左0+043.15為▽151.00的平臺(tái)。詳見“附圖1:廠房基坑開挖設(shè)計(jì)平面圖”。
2. 發(fā)電廠房左右側(cè)邊坡加固處理措施
(1)發(fā)電廠房左右側(cè)邊坡已按設(shè)計(jì)圖紙的要求開挖至▽151.00,且自▽178.00以下基坑開挖均為巖性基礎(chǔ),▽178.00~▽168.00開挖主要按1:0.75坡度進(jìn)行,▽168.00以下開挖主要按1:0.25坡度進(jìn)行,開挖坡度陡,再加上實(shí)際開挖揭露的巖性地質(zhì)條件與基礎(chǔ)勘探的地質(zhì)條件存在較大程度的差異,現(xiàn)狀巖石裂隙發(fā)育,受爆破震動(dòng)和雨水侵蝕的影響,,邊坡有失穩(wěn)、塌陷現(xiàn)象,需要采取措施進(jìn)行加固處理。
(2)承包商綜合考慮巖性走向和裂隙發(fā)育程度、地質(zhì)條件、開挖面設(shè)計(jì)坡度等有關(guān)情況,結(jié)合現(xiàn)場(chǎng)實(shí)際,制定措施如下:對(duì)廠右邊坡▽151.00~▽178.00(含▽168.00和▽178.00馬道)設(shè)置長度為3.0m的系統(tǒng)巖質(zhì)錨桿和隨機(jī)錨桿,系統(tǒng)錨桿間排距為3.0×3.0m,掛網(wǎng)噴C20混凝土,邊坡均設(shè)置深0.7m的PVC花管排水孔,排水孔間排距3.0×3.0m;廠左副廠房▽151.00~▽171.20右側(cè)邊坡設(shè)置長度為3.0m的隨機(jī)巖質(zhì)錨桿,噴C20混凝土,其中▽171.20~▽158.00掛8#鐵絲網(wǎng)。2003年2月10日廠左副廠房▽168.00平臺(tái)及▽168.00~▽151.00下游側(cè)邊坡發(fā)生大面積滑坡塌陷,為增加其穩(wěn)定性承包商在▽168.00平臺(tái)上設(shè)置6根×4.0/根的m25隨機(jī)錨桿,在▽168.00~▽151.00下游側(cè)邊坡設(shè)置4根×4.0m/根和6根×3.0m/根的25隨機(jī)錨桿;根據(jù)“(廠)字第09號(hào)”《設(shè)計(jì)更改通知單》的要求,對(duì)廠右▽151.00~▽168.00、廠下0+002.000~廠上0+023.000段坡面進(jìn)行加固處理:設(shè)置長度為6.0m的32砂漿錨桿,錨桿間排距3.0×3.0m。該部分工作已于2月底之前完成。
3. 邊坡加固處理要求
根據(jù) “(廠)字第10號(hào)設(shè)計(jì)更改通知單”的要求,須對(duì)廠左右邊坡進(jìn)行如下加固處理,邊坡加固處理的具體要求如下所示。
3.1廠右邊坡加固處理要求。
(1)在▽168.00馬道附近間隔布置4排15.0m深錨筋樁及8.0m深32砂漿錨桿,傾角35°,錨桿間距3.0m,排距3.0m,外露0.4m。
(2)在高程▽146.00~▽161.00間隔布置6排15.0m深錨筋樁及8.0深32砂漿錨桿,傾角25°,錨桿間距3.0m,排距3.0m,外露0.4m。
(3)▽146.00以下布置6.0m深28砂漿錨桿,間排距3.0×3.0m,,傾角25°,外露1.0m。
3.2廠左邊坡加固處理要求。
(1)在▽167.00按1.:0.75坡度開挖形成5.0m寬平臺(tái),并在其上布置4排8.0~12.0m深 砂漿錨桿,傾角35°,錨桿間排距3.0×3.0m,外露0.4m。
(2)在高程▽146.00~▽161.00間隔布置5排15.0m深錨筋樁及8.0深32砂漿錨桿,傾角25°,錨桿間距3.0m,排距3.0m,外露0.4m。
(3)▽146.00以下布置6.0m深32砂漿錨桿,間排距3.0×3.0m,傾角25°,外露1.0m。
3.3廠左和廠右▽146.00~▽161.00坡面現(xiàn)澆加固板施工要求。
(1)在高程▽146.00~▽161.00坡面現(xiàn)澆0.4m厚鋼筋混凝土加固板,外側(cè)配鋼筋網(wǎng)(水平主筋25@25cm,豎向分布筋22@25cm),鋼筋凈保護(hù)層厚5cm。
(2)15.0m深錨筋樁及8.0深32砂漿錨桿外露0.4m,并帶0.6m長彎鉤與加固板或錨固頭鋼筋焊接。
(3)錨筋樁鋼筋接長采用坡口對(duì)焊,鋼筋之間每隔3.0m采用10cm焊縫焊接,注漿管距孔底0.5m,沿程與鋼筋點(diǎn)焊連接。
3.4其它要求。
(1)錨桿采用螺紋鋼全長粘結(jié)型水泥砂漿錨桿。
(2)除現(xiàn)澆0.4m厚鋼筋混凝土加固板坡面外,其余坡面掛網(wǎng)噴8.0cm厚C20 混凝土,坡面設(shè)置深0.7m、間排距3.0×3.0m的PVC花管排水孔,梅花型布置。
4. 施工程序
4.1廠右頂部減載處理施工程序。
進(jìn)場(chǎng)施工路布置——漿砌石鉆爆——反鏟開挖 ——自卸車由新上壩路出渣
渣料二次倒運(yùn)入基坑——渣料運(yùn)至棄渣場(chǎng)。
4.2廠右邊坡加固處理施工程序。
腳手架搭設(shè)——錨桿及錨筋樁點(diǎn)位放樣施測(cè) ——錨桿及錨筯樁加工制作
錨桿及錨筯樁點(diǎn)位鉆孔——錨桿及錨筋樁注漿插桿——加固板鋼筋配筋制安——模板支立及架立筋架設(shè)——模板驗(yàn)收——加固板混凝土澆筑——混凝土養(yǎng)生。
4.3廠左邊坡加固處理施工程序。
廠左坡頂減載處理——渣料清除出渣——腳手架搭設(shè)——錨桿及錨筋樁點(diǎn)位放樣施測(cè)——錨桿及錨筯樁加工制作
錨桿及錨筯樁點(diǎn)位鉆孔——錨桿及錨筋樁注漿插桿——加固板鋼筋配筋制安——模板支立及架立筋架設(shè)——模板驗(yàn)收——加固板混凝土澆筑——混凝土養(yǎng)生
5. 廠右坡頂減載處理施工方法及措施
5.1概況。
按“(廠)字第06號(hào)設(shè)計(jì)更改通知單”的要求,承包商在廠右下游側(cè)坡(即廠右0+031.000部位)進(jìn)行二次開挖時(shí)已將坡頂?shù)谌罎{砌石擋墻與第四道漿砌石擋墻間的平臺(tái)面(高程約為▽186.0)作了有效的減載處理,但按“(廠)字第10號(hào)設(shè)計(jì)更改通知單”和“第14號(hào)《監(jiān)理協(xié)調(diào)會(huì)議紀(jì)要》”的要求需對(duì)廠右邊坡頂部作減載處理,因此本次減載的主要部位為第一、第二及第三道漿砌石擋墻(這三道漿砌石擋墻頂?shù)母叱谭謩e約為 ),工程量按實(shí)際發(fā)生量計(jì)。
5.2施工方法。
此三道漿砌石擋墻拆除采用小藥量鉆爆法并配合風(fēng)鎬撬挖人工拆除,拆除后的塊石等渣料拋至廠房基坑再由基坑內(nèi)施工出渣路棄至孫家溝棄渣場(chǎng)。
5.3施工安全。
(1)坡頂減載處理施工時(shí),為免使?jié)L落的石料砸傷基坑內(nèi)機(jī)械設(shè)備及人員,施工階段廠右基坑危險(xiǎn)區(qū)域內(nèi)暫停施工,嚴(yán)禁任何機(jī)械設(shè)備及人員在該區(qū)域內(nèi)逗留,并由專人擔(dān)任安全監(jiān)護(hù)。
(2)由于需要拆除的漿砌石擋墻臨空面面向老廠房已建開關(guān)站,其上又有高壓線路通過,為防止飛石對(duì)已建開關(guān)站及高壓線的影響,需采用小藥量拆除爆破法,孔口加強(qiáng)堵塞并覆以炮被等防護(hù)措施。
6. 廠右邊坡加固處理施工方法及措施
6.1腳手架(腳手平臺(tái))搭設(shè)。
腳手架采用50鋼管3排搭設(shè),腳手立柱間距6.0m,排距2.0m,層高2.5m,搭設(shè)時(shí)需將腳手鋼管與坡面上的錨筋牢固連接以確保腳手架的穩(wěn)定性,每層鋪以竹跳板作為施工平臺(tái),采用8#鐵絲將竹跳板與腳手鋼管牢固綁扎。搭設(shè)好的腳手架至少須能承受1500Kgf的動(dòng)荷載及1000Kgf的靜荷載。
6.2錨桿及錨筋樁加工制作。
(1)錨桿及錨筋樁在鋼筋加工場(chǎng)加工制作,鋼筋切割機(jī)切割機(jī)械拉伸,錨桿的接長采用搭接焊接,單面焊,焊縫長度為鋼筋直徑的2.5倍。
(2)錨筋樁采用3根32鋼筋與 1根25注漿鋼管組成,其結(jié)構(gòu)形式見圖紙。錨筋樁鋼筋接長采用坡口對(duì)焊,為避免在同一截面上的鋼筋出現(xiàn)應(yīng)力集中或脆斷現(xiàn)象,應(yīng)將焊縫相互錯(cuò)開,鋼筋之間每隔3m采用10cm焊縫焊接,25注漿鋼管底應(yīng)短于錨筋樁底部50cm,沿程與鋼筋點(diǎn)焊連接。為便于灌漿施工,在制作焊接注漿鋼管之前可在 注漿鋼管壁上以1.0m間距打鑿若干出漿小孔,出漿孔孔徑不得小于注漿砂漿最大顆粒粒徑;為使安裝好的錨桿(錨筋樁)剛好位于鉆孔中心并使其周圍砂漿分布均勻,應(yīng)根據(jù)鉆孔孔徑及錨桿(錨筋樁)桿徑,在錨桿(錨筋樁)上焊接若干6mm定位支架鋼片。
6.3鉆孔施工。
錨桿孔采用TMY41高風(fēng)壓潛孔鉆孔,而錨筋樁則采用地質(zhì)鉆造孔,鉆孔前由測(cè)量隊(duì)施測(cè)鉆孔點(diǎn)位并以明顯標(biāo)記加以標(biāo)識(shí),然后將鉆機(jī)置于以搭建好的腳手架上,調(diào)好鉆孔角度并將鉆機(jī)與教手鋼管牢固綁扎以防鉆孔偏離設(shè)計(jì)位置。
6.4錨桿及錨筋樁的安裝。
15.0m深錨筋樁及8.0m深32砂漿錨桿采用15T汽車吊吊裝人工輔助送入孔內(nèi),插桿力量完全依靠吊索的上下提升或吊桿左右旋轉(zhuǎn)提供;6.0m深28砂漿錨桿則由人工插桿,當(dāng)插桿有困難時(shí),可采用倒鏈或15t汽車吊配合施工插桿。
6.5灌漿。
(1)8.0m深32砂漿錨桿與6.0m深25砂漿錨桿采用先注漿后插桿,而15.0m深的錨筋樁則采用先插桿后注漿的施工方法。在安裝錨筋樁之前,用膠布將注漿鋼管管口及管壁上的出漿小孔堵住,灌漿時(shí)隨著高壓砂漿的注入,裹于管底的膠布首先脹裂,水泥砂漿注滿錨樁孔一段長度,隨著高壓沙竟的逐漸注入苦果于管壁上的膠布由管底沿著管頂脹裂一段注滿一段,往復(fù)循環(huán)直至完全注滿整個(gè)錨樁孔。
(2)錨桿(樁)孔成孔后應(yīng)采用高壓風(fēng)清孔,不得壓水清洗,清孔完畢后注漿。注漿采用強(qiáng)度不低于325MPa的普通硅酸鹽水泥,砂漿強(qiáng)度等級(jí)應(yīng)不低于M30,采用最大粒徑小于2.5mm的中細(xì)砂。砂漿應(yīng)采用機(jī)械拌和,嚴(yán)禁人工攪拌,隨拌隨用。錨筋樁注漿直接由 注漿鋼管注入,其它錨桿采用 PVC注漿管注入,注漿壓力為0.2~0.8MPa。
7. 廠左邊坡加固處理施工方法
坡頂減載施工。
坡頂減載采用手風(fēng)鉆鉆孔淺孔松動(dòng)爆破與預(yù)裂爆破相結(jié)合的施工方法進(jìn)行處理,爆破參數(shù)見表1和表2。
8. 安全與保證
鉆孔軸線與設(shè)計(jì)誤差不應(yīng)大雨50,積水及巖粉應(yīng)采用高壓風(fēng)吹干凈,遇有塌孔時(shí)應(yīng)掃孔在注漿;
錨桿孔孔位、孔徑、孔深及布置形式應(yīng)符合設(shè)計(jì)圖紙的要求,孔距誤差不得超過5.0cm;
錨桿桿體入孔前應(yīng)平直、除銹,不得有污跡。
9. 結(jié)語
在進(jìn)行水利工程邊坡加固工程時(shí),應(yīng)該綜合工程的實(shí)際情況,地質(zhì)特點(diǎn)、資金使用等要素,在保證邊坡加固工程質(zhì)量的基礎(chǔ)上,選擇最科學(xué)的和最經(jīng)濟(jì)的處理方案,同時(shí)還要考慮施工的安全因素是否能夠得到國家標(biāo)準(zhǔn)。應(yīng)該具體問題具體分析,根據(jù)水利工程邊坡的施工需要選擇最為合適的加固措施,這樣不僅能夠保證施工質(zhì)量,還能夠節(jié)省施工成本,是施工企業(yè)能夠獲得更多的經(jīng)濟(jì)效益,促進(jìn)我國經(jīng)濟(jì)社會(huì)的發(fā)展。
參考文獻(xiàn)
[1]中國葛洲壩集團(tuán)公司編,周厚貴主編,三峽工程施工技術(shù)二期工程卷(VolumeⅡ),中國水利水電出版設(shè).
[2]中國水利學(xué)會(huì)《葛洲壩工程叢書》編輯委員會(huì),陳笑霖主編,葛洲壩工程叢書之土石方工程施工,水利電力出版社,1995年8月.
[3]中國水利水電基礎(chǔ)工程局編,夏可風(fēng)主編,水利水電工程施工手冊(cè) 第1卷 地基與基礎(chǔ)處理,水利電力出版社,2002年12月第01卷.
[4]水利電力部水利水電建設(shè)總局編,康世榮 陳東山總編,水利水電工程施工組織設(shè)計(jì)手冊(cè) 第2卷 施工技術(shù),水利電力出版社,1990年2月.
[文章編號(hào)]1006-7619(2014)10-31-718
[作者簡介] 周建廣(1978.10-),籍貫:浙江臺(tái)州仙居縣人,學(xué)歷:本科,職稱:水利工程師,浙江省市政二級(jí)建造師,水利水電工程專業(yè),目前在仙居縣水力發(fā)電公司工作
文章來源: 永年加固公司 本文鏈接: http://www.miseto.com/a_20170208160806.html 任何關(guān)于加固工程的問題和建議,敬請(qǐng)咨詢:0591-87868646